Mud tank inquiry from Jordan drilling company

We got mud tank inquiry from Jordan drilling company, after some times communication, the end user evaluate our drawing and they hope all necessary equipment is included.

They also have further requirement as below

  1. The funnels of the mud hoppers must be installed on ground level and not on the top of the tank
  2. The mixing hoppers discharge line must have outlet of the tank so that can be connected to our available tank. Advise the connection size of the outlet so that we can order connections between your tank and our tank.
  3. Re the tank equipped with hoppers: It must be installed also cleanout gates on the other (opposite) side of the tank.
  4. The following items from our attached drawings are missing in your drawings:
    1. Re Reserve Tank No.1:

1. Item 4 – High pressure mud gun 2"and line

2. Item 9 – Rig mud pump bottom suction line

3. Item 10 –  Rig mud pump suction bottom valve

4. Item 12 – Fresh water line

  1. Re Reserve Tank No.2:

1. Item 4 – High pressure mud gun 2"and line

2. Item 7 – Rig mud pump bottom suction line

3. Item 8 – Rig mud pump suction bottom valve

4. Item 10 – Fresh water line

  1. Advice the outlet connection size of the ditch so that we can order connections between your tank and our tank.
  2. We remember you that the top of the tanks must be covered with serrated bar grating, equipped with Hand rails of 1½” pipe in walk areas on top of the tank and stairs with handrails.

After the customer got our positive response on the mud tank technical specifications, they issue their order and buy the 2 sets mud tanks. Meanwhile, they also try to buy one sets of 1500hp rig mud system from us. We are following the projects now.
GN Mixing Tank and Its Function inside a Comprehensive Mud Solids Manage Method: http://www.mudcentrifuge.com/post/91340181231/gn-mixing-tank-and-its-function-inside-a-comprehensive