GN Mobile Waste Management System Flexible for Applications

Today, drilling waste management equipments for additional treating the solids cuttings from solids handle technique is extra and much more critical to the drilling liquid service corporations and drilling businesses. Such companies are working with more effective equipments so that you can better treating the solids cuttings and save extra valuable liquid for future drilling.
And much more and more clients require a mobile, flexible solution for waste management, GN developed such a system. This method becomes well known ever considering that it shown to customers. This GN Waste management system is suitable for WBM, OBM and SBM.
This program is combined by following equipments:
2 sets of screw conveyor (augers) GNSC14A-24
1 vertical cutting dryer GNCD930C
1 high-G drying shaker GNZS594HGE-LD
1 set decanter centrifuge, higher speededGNLW363BG-VFD
two sets of Netzsch screw pumps
1 mud tank for reserving liquid to become treated for decanter centrifuge
1 trailer for carrying this comprehensive method, of great high quality but affordable cost.

In case of treating water primarily based mud, the operator can stop the vertical cutting dryer and get started the high G drying shaker only. Some customers only use high-G drying shale shaker within this technique if they only treat WBM as a way to save cost.
Might you’ve interest or need to have much more information regarding drilling waste management, pls make contact with me freely and straight.

Gn Company Drilling as a result of Manufacturing

GN model GOLD CERTIFICATE

desander has been awarded GNSOLIDSAMERIC Ag Heavy Industries? GN model Gold Mark certificate, which is often the highest primehigh-quality award that gn gives to its suppliers,desander  accomplished the certification for its GRE Pipe, selected in accordance with gn Ag Geoje Shipyard?exclusive vendor-evaluation plan.
The gn Geoje Shipyards? vendor-evaluation technique chooses awardees from the gn desander model Gold Mark certificate determined by the suppliers? annual functionality records that happento become evaluated by different departments within GNSOLIDS, such as the QM, A/S, Design and style and style, and Buying departments.
“All staff of item ought to be truly proud of this achievement,” said robert, Senior Vice President for Sales and Promoting of Fiber Glass Systems. “This award is presented to theidealaround the finest, selected from a huge selection ofcompanies worldwide, but recognizing only those that demonstrate excellence in all they do. This award represents our commitment to only performwithin the highest level in pursuit of unparalleled purchaser satisfaction.”
gnsolids began the GNSOLIDSAME model Mark certification to award its greatest suppliers and produce closer partnerships collectivelywith all the firms which willdeliver the highest high quality supplies and gear. By way in the usage in the highest outstandinggear and by means of its carry outusing the greatest suppliers, GNSOLIDSAME Heavy Industries is inside a position to continue its focus oncreating vessels with zero defects and offering its shoppers togetherwith the highest satisfaction.
May possibly was initial awarded the GNSOLIDSAME model Silver Mark in 2008, and NOV has received the GNSOLIDSAME model Gold Mark in the year 2004 till the present.
“It’s normally gratifying to acquire recognition from our crucial shoppers and in unique GNSOLIDSAME Heavy Industries, who’s identified to providegood qualityoptionswithin the marine and offshore industries,” mentioned Hossein Arian, President of May Fiber Glass Systems. “We are focused on serving these marketplace segments from our substantial and expanding Southeast Asia base with extremely specialized plants committed to product high-quality, on-time delivery and engineering help. We seem forward to construct on this quality-based partnership with GNSOLIDSAME Heavy Industries.”
Providersselectedsimply because the excellent partners will get preferential remedy when GNSOLIDSAMERICA regions orders, in accordance with GNSOLIDSAMERICA. Additionally, it provides incentives like PR possibilities to its GNSOLIDSAMERICA model certificate awardees.
Uncoversubstantiallymuch more about solids handle Systems,goods and solutionsfor everybody
some desander links as below:

The function of mud gas separator

Mud gas separator also named as poor boy degasser. Nowadays, Aipu solids handle will share more detail with you about mud gas separator function.
Why we require mud gas separator?
If the massive bubbles’s diameter is higher than φ3~φ25mm, which will make the drilling fluid’s gravity and viscosity ratios deviated significantly, the mud won’t meet the demand of drilling, even additional much more, a worse situation of gas in drilling fluid will result inwell kick or blowout.
But mud gas separator as an expert equipment to treat the gas invade mud can efficiently stay away from the above taking place.
What does mud gas separator function?
The mud from the drilling nicely goes into the poor boy degasser. Because of the gravity, the mud drops down in the inner structure of poor boy degasser.
And after that the gas bubbles bursting out. It was discharged through the separator best from the gas exhaust pipe (pipe length shall not be much less than 50 meters).
If to burn the harmful gas, connect gas exist of poor boy degasser to flare ignition device by pipe in about 30 meters away from the poor boy degasser. The degassing of drilling fluid was sent into shale shaker inlet or shale shaker distributer.
The safety valve on the bestis to release the gas in case the inner pressureis very major, and also the stress meter on the best should be toread the inner pressure.
Why mud gas separator is applied broadly, the following case will provide you with detailed explanation.
Mud gas separator advantages
1. Higher approach efficiency for the duration of continued drilling
2. Promotes safe drilling environment
3. Efficient removal of cost-free gas
4. Constructed to match drilling system and application
5. Control delivery of gas to the flare line
6. Control of retention time of gas-cut mud within the vessel
7. Optimizes approach effectiveness and efficiency
8. Quick transportation, rig-up and rig-down
9. Adaptable for distinct drilling height or other circumstances
Aipu as a professional solids manage manufacture use high high-quality steel supplies manufacturing higher performance mud gas separator. Aipu mud gas separator can proficiently stop the damaging gas erosion, ensure high operating efficiency.

GN Mixing Tank and Its Function inside a Comprehensive Mud Solids Manage Method

Inside a total Mud Tank recycling solids deal with method bigger than 1000Hp, mixing tank is primarily situated since the 5th tank, becoming positioned following trip tank, shale shaker tank, centrifuge tank and suction tank.

1. Function of mixing Mud Tank
In most circumstances, recycling procedure of drilling mud solids handle plan could possibly incur some loss in chemical compounds in drilling mud. That is definitely why to ensure that it is actually basically attainable to hold the perfect functionality and viscosity of drilling mud, operator need to have to add some components like chemical compounds from time for you personally to time in for the recycling technique.

2. Equipments for mixing Mud Tank
Core gear for mixing tank is no doubt mixing hopper. Like GNSLS Jet Mud Tank mixer, producing use of venture principle to suck inside the additive material in towards the approach. Mixing hoppers is normally installed on prime of tank or on tank skid per net page scenario or operator’s preference. GNJBQ mud agitators and GNNJQ mud gun are employed in mud tank to stir the mud from settling down.

three. Pipeline connected to mixing Mud Tank
1st, naturally, the mixing pipelines, like inlet and outlet, are respectively sucking the mud to mixing hopper and delivering mud just following adding material. Secondly, mud gun pipeline, is utilised for connecting all mud guns inside the plan. Thirdly, the water pipeline, is employed for flushing the strategy as well as for adding water for the duration of mixing. For the final, suction pipe line for supplying the mud pump.

This seriously is typically a normal mixing tank GN Solids Deal with kinds and manufactures for COSL Group. All equipments utilised inside this Mud Tank also as within this strategy are developed by GN Solids Manage. Could possibly possibly possibly you’ve got got any interest or query, welcome to produce make get in touch with with with me straight.

visit the website as below for your reference:

http://www.gnsolidsamerica.com/mud-tank.html

http://drillwastemanagement.com/category/uncategorized/

 

Desander & Desilter in Solid Control System

As two indispensable equipments in the solid control system of oil & gas drilling, desilter and desander?are responsible for separating the small solids in the drilling fluids which has been treated by the shale shaker & desilter,The desander takes care of the solid with diameter 45~74μm, and 15~44μm for desilter.

Normally desanders are mounted on the top of the first mud tank together with shale shakers & vacuum degassers, while desilters are mounted together with centrifuges. Sometimes to save the top area of the mud tank, desander & desilter are combined together to work as high efficient mud cleaner.

How to Choose and Design Desilter System,you must care to select Desanders & desilters, high pressure flow?pipes & a small shale shaer at the bottom. For How to Choose and Design Desilter System, only one ways of above is not enough,you also need record the releated Parameter。

while for high efficient it would need two motors. There would equiped two 10″ or 12″ diameter?iron hydrocyclones for desilter just as the solids need to be separated is relatively big, and include some sands in the mud. While for desilters, it would equiped 6 to 12 pcs 4″ diameter hydrocyclones?which are?made of wear resist plastic.

Working Principle of the hydrocyclones.

Hydrocyclone Working Principle – GN,For the work principle of hydrocyclones, it works like this. First the drilling fluids are?sucked up to 0.25Mpa ~ 0.4Mpa by sand pump, and enter into the cones through the side inlet which is?normally only 2-1/2″ diameter. The fluids then flow spirally inside of the cone. Effected by the centrifugal force, the heavy solids in the fluids would be throwed towards the?inner wall of the cones,?go down to the bottem, and discharge through the sand discharge port, while the light fluids would go up and discharge through the upper oulet. The diameter of the bottom discharge port is adjustable, and with a cover of hydrocyclone.

As an quick-wear part of VARIETY OF DRILLING MUD SYSTEM, the lifetime of hydrocyclones is not so long as other parts. So it is neccessary to check their working condition, and replace them with new ones. As a whole set of the hydrocyclone, clamps & flang are also replaced together with the hydrocyclones.